Land Size, Zoning and Location: What to Check Before Buying a Development Site

Buying a property with development potential can create opportunities that a standard investment property may not offer.

But a large block of land doesn’t automatically make a good development site.

Two properties could both sit on 800 sqm of land and have completely different development potential. One might have favourable zoning, good frontage and straightforward access, while the other could be affected by easements, overlays, an awkward shape or planning restrictions.

That’s why development-site research needs to go much further than looking at the land size on a property listing.

Before purchasing, investors need to understand three fundamental factors:

Land size. Zoning. Location.

From there, the analysis should extend to the physical characteristics of the site, planning controls, infrastructure, market demand and financial feasibility.

Here’s what to investigate before buying a potential development site in Australia.


1. Start With Your Development Strategy

Before assessing a site, determine what you’re actually hoping to build.

Depending on the location and planning controls, this might include:

  • A duplex
  • Townhouses
  • Multiple dwellings
  • Subdivision
  • Apartments
  • A knockdown and rebuild
  • Retaining an existing dwelling and developing additional land
  • Commercial or mixed-use development

The requirements for each strategy can be very different.

A block suitable for two townhouses isn’t necessarily suitable for four.

Likewise, land that appears large enough to subdivide may not satisfy the relevant planning requirements.

Rather than asking:

“How big is the block?”

Start with:

“What could realistically be developed on this site?”


2. Check the Total Land Size

Land size is an obvious starting point when assessing development potential.

A larger block can potentially provide more flexibility for:

  • Multiple dwellings
  • Private open space
  • Parking
  • Driveways
  • Landscaping
  • Subdivision

However, total land area doesn’t tell you how much of the property can actually be developed.

Imagine two sites:

Site A

900 sqm

But it has a narrow frontage, irregular shape and significant slope.

Site B

700 sqm

But it’s relatively level, rectangular and has a wide frontage.

Despite being 200 sqm smaller, Site B could potentially provide a more practical development opportunity.

The number that matters isn’t only the total land area.

It’s the usable land area.


3. Understand the Zoning

Zoning is one of the most important things to investigate before purchasing a development site.

Planning schemes generally divide land into different zones that influence how a property can be used and what forms of development may be possible.

Depending on the state, council and location, zoning can affect:

  • Residential development
  • Density
  • Subdivision
  • Commercial use
  • Industrial use
  • Building height
  • Minimum lot sizes
  • Development approvals

Simply seeing another townhouse development nearby doesn’t mean you’ll automatically be able to build the same thing on your property.

Planning controls can vary from one site to another.

Before purchasing, confirm the current zoning and controls applying to the individual property.


4. Find Out What the Zoning Actually Allows

Knowing the name of the zone isn’t enough.

You need to understand how the relevant planning rules affect your proposed development.

Questions to investigate include:

  • Can the land be subdivided?
  • Is dual occupancy permitted?
  • Are townhouses permitted?
  • Can apartments be developed?
  • What density controls apply?
  • Are there minimum site-area requirements?
  • Are there minimum lot sizes?
  • What building heights are permitted?
  • Are there minimum frontage requirements?
  • Is council approval required?
  • Are there restrictions on demolition?

A site can technically have development-friendly zoning while still being unsuitable for your particular project.

The proposed strategy and planning controls need to align.


5. Check the Minimum Lot Size

Minimum lot-size requirements can quickly change the feasibility of a proposed subdivision.

For example, suppose you find an 800 sqm block.

You might initially think:

800 sqm ÷ 2 = two 400 sqm lots.

But property development isn’t that simple.

The applicable planning rules might require larger minimum lots, or other requirements may reduce the practical subdivision potential.

There may also be requirements relating to:

  • Access
  • Frontage
  • Private open space
  • Parking
  • Landscaping
  • Building envelopes

Never calculate potential dwelling numbers using land size alone.


6. Frontage Can Be Just as Important as Land Size

Frontage refers to the width of the property where it meets the street.

For development sites, frontage can be extremely important.

A wider frontage can potentially provide greater flexibility for:

  • Driveways
  • Garages
  • Separate entrances
  • Dwelling orientation
  • Vehicle access
  • Subdivision layouts

Consider two sites that are both 800 sqm.

One has a frontage of approximately 10 metres.

The other has a frontage of approximately 20 metres.

Although their land areas are identical, the development possibilities could be significantly different.

Always assess land size and frontage together.


7. Look at the Shape of the Block

Rectangular sites can often be easier to design around than irregular blocks.

Potential complications can include:

  • Triangular sites
  • Narrow sections
  • Curved boundaries
  • Battle-axe configurations
  • Irregular rear boundaries

An unusual block isn’t automatically unsuitable for development.

However, it can reduce design efficiency and may require more creative architectural solutions.

That can affect:

Buildable area + design + construction costs + final profitability.


8. Check the Slope

A site that looks affordable may become significantly more expensive once site works are considered.

Sloping land can potentially require:

  • Excavation
  • Retaining walls
  • More complex foundations
  • Drainage solutions
  • Additional engineering
  • Split-level construction

These costs can add up quickly.

Before purchasing a site with noticeable slope, investors may need professional advice to understand the likely implications.

A cheaper purchase price doesn’t necessarily mean a cheaper development.


9. Investigate Easements

An easement gives another party certain rights over part of the land.

Common easements can relate to:

  • Sewer
  • Drainage
  • Water
  • Electricity
  • Access
  • Shared driveways

Imagine purchasing a 900 sqm site because you plan to build at the rear.

After settlement, you discover a significant easement runs directly through your intended building area.

You still own the land, but you may not be able to use that section in the way you expected.

Title documents and relevant searches should therefore form part of development-site due diligence.


10. Check for Planning Overlays and Additional Controls

Zoning isn’t necessarily the only planning control affecting a property.

Depending on the location, land may also be affected by overlays or other controls relating to matters such as:

  • Heritage
  • Flooding
  • Bushfire
  • Vegetation
  • Environmental significance
  • Neighbourhood character
  • Design requirements

These controls can potentially affect what can be constructed and how development needs to be designed.

A property with seemingly favourable zoning can therefore still have significant development constraints.


11. Understand Building Height Restrictions

If your feasibility relies on constructing multiple storeys, building-height controls become extremely important.

Suppose your project only works financially if you can construct three levels.

If planning controls significantly restrict the allowable height, the entire strategy may need to change.

Height can also interact with other planning considerations, including:

  • Overshadowing
  • Privacy
  • Neighbouring properties
  • Streetscape
  • Heritage
  • Views

Check these restrictions before basing your feasibility on a particular design.


12. Check Setback Requirements

Setbacks determine how far a building may need to sit from property boundaries or other features.

Depending on the planning controls, this could include:

  • Front setbacks
  • Rear setbacks
  • Side setbacks
  • Street setbacks
  • Waterway setbacks

A site may be 800 sqm in total, but once setbacks and other restrictions are applied, the actual building envelope can be much smaller.

This is another reason raw land size doesn’t tell the full story.


13. Check Sewer and Water Infrastructure

A site may have development potential on paper but still require expensive infrastructure works.

Investigate:

  • Sewer availability
  • Sewer location
  • Water connections
  • Stormwater
  • Electricity
  • Telecommunications
  • Other required services

Where existing infrastructure can’t adequately support the proposed development, upgrades or extensions may be required.

Those costs need to be included in the project’s feasibility.


14. Don’t Forget Stormwater and Drainage

Additional buildings generally create additional hard surfaces such as:

  • Roofs
  • Driveways
  • Paths
  • Garages

Rainwater needs to be appropriately managed.

Depending on the site and local requirements, stormwater solutions could involve:

  • Drainage infrastructure
  • On-site detention
  • Water tanks
  • Pits and pipes
  • Easements
  • Engineering

Drainage issues discovered late in the project can become expensive.

They should be investigated during the due-diligence stage.


15. Investigate Flood Risk

Flooding can affect both the development potential and cost of a site.

Depending on the property, flood-related requirements may influence:

  • Floor levels
  • Building position
  • Construction methods
  • Access
  • Insurance
  • Approval requirements

A property doesn’t need to appear close to a river to potentially have flood-related constraints.

Always investigate the specific site rather than making assumptions based on appearance.


16. Check Bushfire Risk

Bushfire-prone land may require additional planning, design and construction considerations.

Depending on the site, these could potentially affect:

  • Building materials
  • Landscaping
  • Setbacks
  • Access
  • Development layout
  • Construction costs

This doesn’t automatically mean bushfire-prone land can’t be developed.

It means the additional requirements need to be understood and factored into the project’s feasibility.


17. Check Heritage Restrictions

Heritage controls can have a major impact on development plans.

A property might be individually heritage-listed or sit within a heritage conservation area.

Potential implications can include restrictions or additional requirements around:

  • Demolition
  • Alterations
  • Building design
  • Building height
  • Street appearance

This can be particularly important for investors considering a knockdown-and-rebuild strategy.

Don’t assume an existing dwelling can simply be demolished.


18. Investigate Trees and Vegetation

Large trees can affect where buildings, driveways and services can be positioned.

Depending on local rules, certain vegetation may also be protected.

Consider:

  • Tree protection zones
  • Root systems
  • Biodiversity controls
  • Vegetation overlays
  • Removal requirements

Tree removal isn’t always straightforward.

If the development concept relies on removing significant vegetation, investigate whether that’s actually possible before purchasing.


19. Check the Previous Use of the Land

Previous land use can create additional development risks.

This can be particularly relevant for sites previously used for:

  • Industrial purposes
  • Workshops
  • Service stations
  • Manufacturing
  • Agriculture

Potential contamination may require environmental assessment and, in some cases, remediation.

Remediation can add significant time and cost to a project.

Understanding the history of the site is therefore an important part of due diligence.


20. Location Still Matters

Finding land that can technically be developed is only half the challenge.

You also need people who want the finished product.

A development site should be assessed in relation to:

  • Employment
  • Schools
  • Shopping
  • Healthcare
  • Public transport
  • Major roads
  • Parks
  • Universities
  • Lifestyle amenities

The end product needs an end user.

That might be:

  • Families
  • First-home buyers
  • Downsizers
  • Professionals
  • Investors
  • Tenants

The location should support the type of development you’re planning.


21. Understand the Local Buyer

Imagine you’ve determined that four townhouses could potentially fit on a site.

Before getting excited about the dwelling count, ask:

Who is going to buy them?

If the local market is dominated by downsizers, they may prefer:

  • Single-level living
  • Low-maintenance gardens
  • Internal garage access

A family market may value:

  • Three or four bedrooms
  • Multiple bathrooms
  • Outdoor space
  • Storage
  • Parking

A development should ideally be designed around actual market demand rather than simply maximising the number of dwellings on the land.


22. Research Comparable New-Build Sales

A project’s profitability depends heavily on the value of the finished properties.

This is often referred to as the Gross Realisation Value (GRV).

Suppose you plan to build three townhouses.

Recent comparable new townhouses have sold for:

$720,000

$735,000

$750,000

Using approximately $735,000 per dwelling as an initial assumption:

3 × $735,000 = $2,205,000 estimated GRV

But the assumption should be supported by genuine comparable evidence.

Don’t build a feasibility using the highest asking price you can find.

If the expected end value is overly optimistic, the projected profit can disappear quickly.


23. Look at Future Supply

Current demand isn’t the only consideration.

What else is being developed nearby?

Investigate:

  • Approved developments
  • New housing estates
  • Apartment projects
  • Townhouse developments
  • Subdivisions

If your project is expected to complete in two years, today’s property market isn’t necessarily the market you’ll be selling into.

Significant new supply can increase competition.


24. Consider Construction Access

Developers also need to consider how the site will actually be built on.

Ask:

  • Can trucks easily access the property?
  • Is the road particularly narrow?
  • Can machinery enter the site?
  • Are there overhead powerlines?
  • Are neighbouring properties very close?
  • Is there enough space for materials and equipment?

Restricted construction access can increase complexity and potentially increase costs.

This is particularly relevant for infill development in established suburbs.


25. Understand the Approval Process

Different projects can require different planning and building approvals.

Depending on the jurisdiction and development type, the project may require various applications, assessments and professional reports.

These can influence:

  • Approval costs
  • Consultant costs
  • Project timeframe
  • Holding costs
  • Overall development risk

A six-month delay isn’t simply an inconvenience.

If you’re paying interest, rates and other holding costs during that period, delays can directly affect profitability.


26. Calculate the Entire Development Cost

A development feasibility needs to include much more than:

Land + construction.

Potential costs can include:

Acquisition

  • Purchase price
  • Stamp duty
  • Conveyancing
  • Due diligence

Professional and Planning

  • Architect or designer
  • Town planner
  • Surveyor
  • Engineers
  • Specialist reports
  • Approval fees

Construction

  • Building contract
  • Demolition
  • Site works
  • Service connections
  • Landscaping
  • Driveways
  • Retaining walls

Finance and Holding

  • Loan interest
  • Finance fees
  • Council rates
  • Insurance
  • Land tax where applicable

Selling

  • Agent commission
  • Marketing
  • Legal costs

Contingency

Unexpected costs and variations.

Missing several smaller costs can make an apparently profitable development significantly less attractive.


27. Calculate Potential Development Profit

A simple starting calculation is:

Gross Realisation Value – Total Development Cost = Potential Development Profit

For example:

Estimated GRV: $2,200,000

Total Development Cost: $1,850,000

Potential Profit: $350,000

Profit on cost would be approximately:

$350,000 ÷ $1,850,000 × 100 = 18.9%

However, this is only an illustrative feasibility.

The next step is stress testing.


28. Stress-Test the Development

A project shouldn’t only work under perfect conditions.

Ask what happens if:

  • Construction costs increase by 10%
  • Interest rates rise
  • Approval takes six months longer
  • Sale prices fall by 5%
  • Unexpected site works are required
  • One dwelling takes longer to sell

For example, if your expected profit is $300,000 but a relatively small change in construction costs eliminates most of that margin, the project may have limited room for error.

A good feasibility needs to consider downside scenarios as well as the expected outcome.


Development Site Due-Diligence Checklist

Before buying a development site, consider:

FactorWhat to Check
Land SizeTotal and usable area
ZoningPermitted development and land use
Minimum Lot SizeSubdivision requirements
FrontageWidth and access
Site ShapePractical building envelope
SlopeExcavation and engineering
OverlaysHeritage, flood, bushfire and other controls
HeightBuilding-height restrictions
SetbacksBoundary requirements
EasementsRestrictions across the land
ServicesSewer, water and electricity
StormwaterDrainage requirements
TreesProtection and removal restrictions
AccessConstruction and vehicle access
LocationEnd-user demand
Comparable SalesRealistic finished values
Future SupplyCompeting developments
Approval ProcessTime, cost and planning risk
Construction CostsRealistic current budget
FeasibilityRevenue, costs, profit and contingency

The Biggest Mistake: Buying First and Researching Later

A large block at an attractive price can create a sense of urgency.

But development investors need to resist buying purely because a property looks like an opportunity.

Imagine purchasing an 850 sqm block intending to build three townhouses.

After purchase, you discover:

  • An easement crosses the rear of the site
  • The frontage restricts your preferred layout
  • Significant retaining works are required
  • Planning controls reduce the achievable building envelope
  • The development can realistically support only two dwellings

The entire feasibility has changed.

This is why due diligence should occur before you’re unconditionally committed wherever possible, with appropriate professional advice.


The Cheapest Site Isn’t Necessarily the Most Profitable

Development investors can become overly focused on getting the land cheaply.

But consider:

Site A – $600,000

Significant slope, difficult access and major site works.

Site B – $650,000

Level land, better frontage and simpler access.

Site A is $50,000 cheaper.

But if it requires an additional $100,000 in excavation, retaining and engineering, the apparently cheaper site may ultimately cost more to develop.

Purchase price should therefore be considered within the total project cost, not in isolation.


Why Professional Due Diligence Matters

Property development involves planning, construction, finance, legal and taxation considerations.

Depending on the project, professional advice may be required from:

  • Town planners
  • Surveyors
  • Architects or building designers
  • Engineers
  • Builders
  • Solicitors or conveyancers
  • Accountants
  • Finance professionals
  • Environmental or specialist consultants

The cost of appropriate due diligence can be small compared with the cost of purchasing a site that doesn’t support the intended project.


Why Work With DDP Projects?

At DDP Projects, we understand that identifying a potential development opportunity involves much more than finding a large block of land.

The right site needs to make sense from several perspectives:

  • Land characteristics
  • Location
  • Planning potential
  • Market demand
  • Development strategy
  • Construction considerations
  • End value
  • Financial feasibility

Our approach is focused on helping investors understand the opportunity before moving forward.

Because successful property development doesn’t start when construction begins.

It starts with choosing the right site.

Whether you’re considering your first development or looking for your next project, thorough research and feasibility analysis can help you better understand the potential risks, costs and opportunities before committing your capital.


Frequently Asked Questions

What should I check before buying a development site?

Key considerations include land size, zoning, frontage, minimum lot sizes, site shape, slope, overlays, easements, services, access, planning controls, local market demand and financial feasibility.

Does a large block automatically have development potential?

No. A large site may still be affected by planning restrictions, easements, difficult access, slope or other constraints.

Why is zoning important for property development?

Zoning helps determine how land can be used and what types of development may potentially be permitted. The specific rules applying to the site need to be checked.

How important is frontage?

Frontage can significantly influence driveway access, dwelling layouts, parking and subdivision potential. Two blocks with identical land areas can have very different development possibilities because of their frontage.

Can I subdivide any large block?

No. Subdivision depends on the relevant planning rules and the characteristics of the individual site.

Can you build over an easement?

This depends on the easement and requirements of the relevant authority. It should be investigated before designing or purchasing a site.

Does a sloping block cost more to develop?

It can. Sloping sites may require excavation, retaining walls, specialised foundations and additional engineering.

How do I know how many dwellings can fit on a site?

The answer depends on planning controls, land area, frontage, setbacks, parking, landscaping, access and other site constraints. Professional planning and design advice may be required.

What is a development feasibility study?

A feasibility study assesses the likely revenue, costs and financial outcome of a proposed development to determine whether the project appears commercially viable.

Should I complete a feasibility before buying development land?

A preliminary feasibility can be extremely useful before committing to a site because it allows you to assess the likely costs, end values and potential profit before proceeding.